Vetus M4.17 Wartungshandbuch Seite 14

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 80
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 13
Commissioning the engine
Before starting the engine for the first time,
the following procedures must be carried
out:
Filling with engine oil
As a rule engines are delivered empty of
oil.
Fill the engine with oil through the filler
neck on top of the valve cover, for quantity
and specification see page 63.
Check the oil level with the dipstick, see
page 23.
A second oil filling cap is located at the
front of the engine on starboard side.
First commissioning
Use
12
Engine Oil
5 litres (1 UKgal) 15W40
API: CD, CE or CF4
ACEA: A3/B3, A3/B4
For example:
- Vetus Marine Diesel Engine Oil
15W-40
- Shell Nautilus Premium Inboard Oil
15W-40
OIL
VD01052
OIL
VD01053
Seitenansicht 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 79 80

Kommentare zu diesen Handbüchern

Keine Kommentare